Zhejiang Dongxing Textile Machinery builds machines for yarn processing and runs a second business, the Xingbao yarn-processing division. Its catalogue covers doubling, short-staple and chemical-fibre twisting, thread-making, false-twist equipment, brushing and winding. The model Dongxing puts at the front is the DX231A electronic precision doubling machine, sold as the feed-package stage for its short-staple G series twisters. A useful enquiry describes your whole yarn route: fibre and count, how many ends are doubled, the package each machine hands on and the twister that comes next.
Dongxing works on the spinning and yarn-preparation side of a textile mill. Doubling machines build the feed package. Twisting and thread-making machines put in the twist, and the false-twist, brushing and winding categories change the character of the yarn or its final package. The company introduction mentions in-house sheet-metal work, assembly and a sample yarn facility.
Few mills replace a whole route at once. The table links each stage to the matching Dongxing family and to the hand-over you should spell out, so the model on the quote suits the machines on either side of it. [1][2]
Swipe the table sideways to see every column.
What Dongxing makes and where each family fits
Stage in your mill
Dongxing family
What to describe in the enquiry
Building the feed package
DX231A electronic precision doubling, plus other doubling variants in the catalogue
Yarn and number of ends going in, tube, package size and weight, and the twister that will unwind it.
Twisting or thread-making
Short-staple, chemical-fibre and thread-making families
Yarn construction, twist level and direction, and whether the machine gives the first twist or a later one.
Changing the yarn effect or final package
False-twist, brushing and winding categories
The yarn result you are after and the process that follows; ask for a named model with its own data sheet.
Developing a new yarn
Xingbao yarn-processing division
Sample material, target output, the machine set up for the trial and who holds the process settings afterwards.
02
DX231A: the doubling machine Dongxing leads with
The DX231A combines ends into one package ready for twisting. Dongxing lists electronic control of package formation, a yarn creel built into the frame and an optional length counter on each spindle. The full table and option list for the version on sale are on the DX231A Type I page.
Spindles sit at a 450 mm pitch, grouped four to a section. The frame takes up to twelve sections, and forty positions are standard. Dongxing gives the yarn range as short-staple 10–80 Ne, with a full package of up to 4 kg.
Two lines of the table need an answer before you plan output or floor space. Winding speed is printed in r/min, a rotational unit, so get a corrected figure before working out metres per minute. The 2,380 × 860 × 1,300 mm outline carries no note on how many sections it covers, so request a layout for the position count you plan to buy.
Dongxing also promotes lower energy use on the downstream two-for-one twister when it runs on prepared packages. That saving belongs to the twisting stage and rests on the comparison behind it. If it matters to your business case, measure it on your own yarn with equal package quantity and equal twister settings. [2]
03
Judge the package on the machine that unwinds it
Since Dongxing describes a sample yarn facility, it is fair to ask for a trial on your own material. Set it up so the doubled package is judged where it counts, on the twister that receives it. [1][2][3]
List the route
Write down each machine in the route, new or kept, with the yarn material and count, number of ends, input package, target output and the next operation.
Wind sample packages
Note the winding settings, tube size and package weight, and check build and density by a method both sides accept. State whether the length counter is fitted.
Unwind them on your twister
Feed the packages to the intended twister and log unwinding, end separation, breaks, stops and the finished yarn at agreed settings. File the doubling and twisting records together.
Compare like with like
Weigh handling, power or productivity on equal yarn and equal accepted output. Count rejects, downtime and operator work next to the headline figures.
Fix the supplied machine
Keep the samples, settings and measurements, then attach the real layout, control options and a repeatable commissioning procedure to the offer.
04
Installation, training and spare parts
Dongxing's service page offers three ways to install: guidance for the customer's own crew, engineering supervision, or an installation team sent by Dongxing. The same page mentions support for custom yarn-process work. Make the quotation say which option you are buying, where the work takes place and who brings labour, tools and utilities.
Ask for operator and maintenance training, manuals, a list of wear parts and consumables, and a named route for technical questions after start-up. The service page quotes some promotional percentages but gives no response time, warranty period or delivery promise, so put those terms in the contract. [3]
05
Company listing and documents
The member directory of the Chinese Textile Machinery Association lists 浙江东星纺织机械有限公司 as entry 465. That places the company inside an industry body; it carries no machine ratings or factory output figures.
Dongxing's website gives more than one figure for its years in the trade and shows counters for patents and standards. If you are building a manufacturer profile for supplier approval, ask for the current documents you need, such as patent certificates for the features you are paying for.
The Chinese site links to an English website that returned a 404 page on 11 October 2026. Check the current contact channel for export orders with Dongxing directly. [1][4][5]
Equipment & specifications
Published model or series information. Open the equipment record for its full scope and configuration notes.
Generic spinning machinery illustration · not the listed equipment
The DX231A Type I is a manually operated precision doubler from Dongxing that prepares feed packages for twisting. Its table lists short-staple yarn from 10–80 Ne, packages up to 4 kg on a tube of your choice, a 450 mm pitch, 4 positions per section and 40 standard positions. To get a price, give the yarn and end count, the tube, the position count you want and the twister model downstream.
Checklist and notes are not uploaded or saved after reload. Copy or download a draft to keep it. Opening the workspace does not send this draft.
Sources & review
Before ordering, ask Dongxing to confirm in writing: the DX231A section and position count with its layout, what the r/min speed line means, which options and controls are included, the count range for your fibre, the basis of any energy figure you plan to use, and the installation, training, warranty, spare-part and delivery terms. Facilities and counters on Dongxing's website are the company's own statements, and the association entry covers the company name only, so request current documents for supplier approval.
The DX231A parameter table, electronic package formation and the optional length counter. The speed unit and outline dimensions need clarifying with Dongxing.
Publication: Undated; accessed 11 October 2026 · Reviewed: 2026-10-11